Saturday, June 03, 2006

WEEK 3

This week i strated off my project.
As per the plan worked out with my working mentor Sh. V.K. Jain, i had to study the pack room and winding consumbales this week.

So this week i visited spinning, studied 6 consumables there : 3 kinds of bearings, 2 types of grease and cotton rags.

using the system (SAP) i took out the consumption of these consumables over the past 5 years. i also analysed them and compared with shopfloor realities. Improper tendancies were confirmed for.

after spending 3 days in winding shop and preparing the report on winding consumables , i was transferred to pack assembly room.
there were 5 main consumbles used: meshes,S.S.Powders and various tools.
even after closely studying the process for 3 days I could not found any space for opinising consumption of these consumbales. i prepared there trends too but the were totally demand driven trends.

at the end of 3 days i prepared my report.

my next week target will be spinning consumables.